Hillside School.png

Built: 1928
Enrollment: Over 400 students and families served
Staff: 45 (these staff are shared between Rice and Hillside)


EDUCATIONAL ADEQUACY ASSESSMENT

According to an expert assessment of educational adequacy, these are the top facility issues at Hillside School:

  • Outdated HVAC system, including limited or no ventilation for gym and second floor

  • No ADA access to second floor

  • Repairs needed to walls, steps, windows and exterior brick

  • Aging roof

  • Deteriorated parking lot surface

  • Asbestos

Hillside Ed Ad.jpg

More information coming soon